Helonic is an AI construction drawing analysis platform for preconstruction teams using Helonic for drawing set completeness.
Verify your construction drawing set is complete with all required sheets, schedules, legends, and code-required diagrams. Get a completeness score across every discipline before issuing for construction, and know exactly what is missing.
An incomplete IFC set creates RFIs and change orders because the contractor is pricing and building from sheets that were never issued.
Helonic runs hundreds of completeness checks in minutes across every discipline.
Drop your complete PDF drawing set into Helonic. We process sheets from all disciplines: architectural, structural, mechanical, electrical, plumbing, and civil.
AI catalogs every sheet type, schedule, legend, general note, and diagram present in your set and compares it against what a complete set requires.
Each discipline receives a completeness score based on the presence and quality of required elements: floor plans, details, schedules, legends, and notes.
Receive a prioritized list of missing elements with specific recommendations for what to add before issuing for construction.
Helonic verifies required sheets, schedules, legends, general notes, and code diagrams against what the index and typical IFC package demand.
Confirms presence of floor plans, ceiling plans, elevations, sections, and enlarged plans for each level and area.
Checks that door schedules, window schedules, finish schedules, and equipment schedules are present and populated with all required fields.
Ensures abbreviation legends, symbol legends, and material hatch legends are included and match symbols used on drawings.
Verifies that discipline-specific general notes sheets are present and contain standard required information for the project type.
Confirms presence of area separation diagrams, egress plans, fire-resistance-rated construction plans, and accessibility route diagrams.
An incomplete drawing set is a liability. Missing schedules force contractors to guess at materials. Missing details mean field workers are making design decisions that should have been made by the architect. Missing code diagrams delay plan review approval. Every gap in the documents becomes an RFI, a change order, or a construction error.
The challenge is that no one has time to systematically check a 300-sheet set for completeness across six disciplines. Helonic performs over 200 checks in minutes, verifying that every required sheet, schedule, legend, and diagram is present and accounted for. You get a clear completeness score and a specific list of what to address before IFC.
Related drawing-integrity features.