Understanding room finish schedules, codes, and material specifications on architectural drawings
A finish schedule is a table that specifies the finish materials for floors, walls (base, wainscot, upper), and ceilings in each room. It's typically found on the interior elevation sheets (A5 series) or general notes.
A finish schedule lists each room with floor, base, wall, and ceiling finish codes so reviewers can match rooms to materials.
| Room # | Room Name | Floor | Base | Wall | Ceiling | Clg Ht |
|---|---|---|---|---|---|---|
| 101 | Lobby | F-1 | B-1 | W-2 | C-1 | 10'-0" |
| 102 | Office | F-2 | B-2 | W-1 | C-2 | 9'-0" |
| 103 | Restroom | F-3 | B-3 | W-3 | C-3 | 9'-0" |
| 104 | Storage | F-4 | B-2 | W-1 | C-4 | 8'-0" |
The finish schedule uses codes that reference a legend (usually on the same sheet). Here's a typical example:
Finish schedules use short codes such as ACT for acoustic ceiling tile and GWB for gypsum wall board.
Finish codes point to specification sections with the full material details, so you always cross-reference the specs.
The most common finish-schedule errors are room numbers that do not match the plans and finish codes that do not match the specs.
Room numbers on plans don't match the schedule. Always verify against floor plans.
Codes used in schedule aren't defined in the legend. Submit an RFI for clarification.
Schedule ceiling height conflicts with reflected ceiling plan or sections.